S5 to S7 System Upgrades
One of the largest drinks production sites in Scotland required a system upgrade to their Case Conve...
S5 to S7 System Upgrades
One of the largest drinks production sites in Scotland required a system upgrade to their Case Conveyor and Palletisation Cell due to obsolete Siemens S5
PCS7 Control System Upgrade alongside Mechatherm
Mechatherm International Limited have been designing and supplying turnkey solutions, predominantly for the Aluminium industry since their formation in 1973.
Phase 3 – Valve Replacement Project Completion
Kigtek were the principal contractors on a large scale valve replacement project for a major spirit production site in Scotland.
Kigtek Supports with IT/OT Convergence Challenges
Information Technology and Operational Technology have historically co-existed on separate paths, but driven by Industry 4.0 and IIoT, the two are now converging.
In House Panel Building Capacity
Many customers we work with have a long history of manufacturing, which while admirable can bring challenges around aging equipment and infrastructure. Here at Kigtek
Phase 2 – Valve Replacement Project Success
Kigtek are currently the principal contractors on a large scale valve replacement project for a major spirit production site in Scotland.