Posts

One of the largest drinks production sites in Scotland required a system upgrade to their Case Conveyor and Palletisation Cell due to obsolete Siemens S5 equipment. Due to the critical production nature of the site, it was imperative the solution provided would result in a smooth migration, be thoroughly tested, and involve minimal production downtime.